Meteorological Towers collect wind data, System Impact Transmission study complete, Permitting Activities continue.

• Wind Analysis: National Wind Assessments, formerly Romuld Wind Consulting of Grand Forks, ND, completed our wind assessment. Two on-site meteorological towers have been erected and are actively measuring wind speed, wind direction, and ambient air temperature in the wind farm project area.

• Environmental: Pinnacle Engineering, of Maple Grove, Minnesota, completed a preliminary environmental review of the project and did not find any significant obstacles to developing the project. They also obtained preliminary clearance from the Federal Aviation Authority (FAA). Snyder and Associates, of Council Bluffs, Iowa is actively working on local site permitting and environmental activities with respect to the project development.

• Transmission: Excel Engineering completed the preliminary transmission report and is managing the interconnection process with Midwest Independent System Operator (MISO). The project has completed the system impact studies and will shortly move into the facilities studies phase.



            Home |The Board| Developer | Overview | Map | Progress |

News | Participate| Contact |

 

Copyright © 2007 NorthStar Wind Farms. All Rights Reserved.



This site is powered by Drupal and K2
RSS Entries